Zenner SINGLE-JET METERS Manuel d'utilisateur Page 1

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Instruments de mesure Zenner SINGLE-JET METERS. ZENNER SINGLE-JET METERS User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
The installation has to be done by qualied profes-
sional personnel. The general rules of technology
have to be followed.
Notes
Install vertically only, not tilted, inclined
or overhead.
Mount a ball valve upstream of the UPT.
Consider the correct ow direction. This is
indicated by an arrow on the side of the UPT.
The optimal depth (mid pipe below nished wall)
is 65 mm to 93 mm.
Capsule is delivered without inserted sealing ring
with loosely screwed tightening lid.
Installation UPT
1. Flush piping system
2. Close valves, release pressure and drain
the pipe.
3. If screwed:
a) Clean sealing surfaces and t in new
sealing in the ttings.
b) Mount the UPT and tighten the screws.
4. If soldering:
a) Remove mounting accessory, tightening
lid and sealing ring.
b) Solder connections and let cool down
completely the UPT.
EnergyMetering
Measuring capsule Minolist 2”
(ER1 and ER2)
Installation instructions
Minolist ER 1
Minolist ER 2
Vue de la page 0
1 2

Résumé du contenu

Page 1 - Installation instructions

The installation has to be done by qualied profes-sional personnel. The general rules of technology have to be followed.Notes Install vertica

Page 2 - EnergyMetering

EnergyMetering5. Screw on the UPT. Fit in the sealing ring in the nut und tighten the lid.6. Open slowly the closing valves and check the installati

Commentaires sur ces manuels

Pas de commentaire